Why?

Upgrades to the electrical supply for Gateway II at 50 Prescott Street require a power shutdown. To protect from power surges, IT recommends office equipment be powered off prior to the shutdown.

Impact

All devices on stand-by or generator power will be maintained. All other equipment will not have power.

Action Needed

Please shutdown office equipment (computers, printers, copiers, projectors, etc.). Using a surge protector is recommended wherever possible. In the absence of a surge protector, the equipment should be unplugged from the power source.

Details